Airtable Extractor by Table Capture icon

Airtable Extractor by Table Capture Chrome Extension Analysis

Web Scraping & Data Extraction

Chrome extension ID: jdldgiafancpgcleiodepocjobmmfjif

A Chrome extension designed to help users download data from Airtable views and embedded tables. It supports multiple formats including Excel, CSV, and JSON, and provides a way to copy data directly to the clipboard.

Developer:GeorgeMike.com
Version:1.0.73
Size:532KiB
Last updated:

Overview

Installs

4K+

Rating

4.7

43 reviews

Languages

8 locales

Includes Deutsch, English, español, français...

Market analysis

Review-backed positioning, friction, and market signals for this Chrome extension.

Backed by review samples

Macro category

Web Scraping & Data Extraction

Pricing friction

Moderate review signal

Complaint intensity

Moderate review signal

Listing & review signals
Observed signals from store listing text and review samples.

Listing positioning

The product positions itself as a specialized utility for extracting data from Airtable shared views into XLSX, CSV, or JSON formats. It emphasizes ease of use via a right-click context menu and the ability to export embedded Airtables.

Inferred product pattern

A niche utility tool providing high-value data extraction for Airtable users through a credit-based or one-time license model.

Review-backed pain points

Users reported frustration with the UI (difficulty finding the context menu) and technical inaccuracies where the extension incorrectly identifies tables as forms. There is also friction regarding how free export counts interact with data filters.

Observed feature gaps

Inconsistencies in page type detection (table vs. form) and potential lack of UI guidance for the context menu trigger.

Tags
Airtable ExtractorData ExportAirtable to ExcelData Scraping
Target users

- Data Analysts

- Researchers

- CRM Managers

- Business Professionals

Primary use cases

- Exporting Airtable data to Excel or CSV

- Bypassing 'copying disabled' restrictions in Airtable shared views

- Extracting complex relational data from Airtable bases

Positive themes

- Excellent and responsive customer support

- Ability to extract data from restricted/protected Airtable views

- Significant time savings compared to manual entry or OCR

- Reasonable one-time purchase pricing model

Negative themes

- Difficulty discovering or using the right-click context menu

- Inaccurate error messages identifying tables as forms

- Confusion regarding how free export limits apply to filtered datasets

Observed friction

- Free-tier complaints detected

- Users generally find the non-recurring, one-off purchase model reasonable, though some confusion exists around free tier limits when using filters.

Evidence boundary: Evidence gathered from store listing features and user reviews highlighting high satisfaction with data extraction and support, alongside usability complaints. The analysis is based on a relatively small sample size of 42 reviews.
Complaint summaries
Review-backed complaint signals grouped by operational area.

Support

No support complaints; users explicitly praised the developer for fast and helpful responses.

Reliability

Some users experienced errors where the tool failed to recognize tables or claimed the page was an Airtable form.

Privacy

No privacy or security complaints observed.

Access & pricing

- Free entry with paid features

- No account requirement observed

- Limited free usage observed

Store listing facts

Listing assets

- Screenshots: 1

- Videos: 1

- Languages: 8

Trust signals

- Privacy policy

- Developer contact

- Official website

Store metadata

- Version: 1.0.73

- Size: 532KiB

- Last updated:

Store description excerpt
Short excerpt from the public Chrome Web Store listing; full copy is available on the official store page.
Last updated: June 2026 Features: • Export to Microsoft Excel (XLSX), CSV, JSON • Copy to Clipboard • Export embedded Airtables How it works: • Just right-click to download in your desired format • You get 5 free exports, afterwards you can purchase a 30-pack of exports or a license for unlimited exports. Special Thanks: This extension is a fork + update of one made by Gonçalo Cabrita (gmcabrita.com).

Listing SEO keywords

Search intent keywords
Keyword signals for evaluating how users may discover, compare, or search for this extension category.

Core discovery

Airtable to ExcelAirtable to CSVAirtable data extractorExport Airtable shared view

Comparison

Table CaptureAirtable export tool

Problem

Airtable copying disabledExtract data from AirtableAirtable to JSON

Alternative

Airtable scraperAirtable data downloader

Similar extensions

Jump to related discovery paths:

FAQ

What is Airtable Extractor by Table Capture mainly used for?
A Chrome extension designed to help users download data from Airtable views and embedded tables. It supports multiple formats including Excel, CSV, and JSON, and provides a way to copy data directly to the clipboard.
What market signals stand out?
Early or small audience with limited review base. Last known update: 06/12/2026.
What should builders compare before entering this space?
Compare install concentration, rating quality, update recency, screenshots, developer portfolio, listing claims, and review-backed friction signals.
Is this page review-backed?
Backed by review samples. This page combines store metadata with selected review signals, while raw store metrics remain visible for comparison.

Screenshots

Airtable Extractor by Table Capture screenshot

Links

Recommended Chrome extensions

Related listings from the same category, trending peers, and the same publisher portfolio.

Browse workflow
Table Capture icon

Table Capture

GeorgeMike.com

Copies HTML tables to the clipboard or exports them to Microsoft Excel, CSV, Google Sheets, Office 365, etc.

Installs

200K+

Rating

4.3

Video Scrubber for Instagram icon

Video Scrubber for Instagram

GeorgeMike.com

Displays player controls for video content on Instagram

Installs

9K+

Rating

3.9

Pop up blocker for Chrome™ - Poper Blocker icon

Pop up blocker for Chrome™ - Poper Blocker

dingosolutions

Block popups, ads, cookie requests, trackers, notifications, ads on social media & more. A clean browsing experience starts today.

Installs

2.0M+

Rating

4.8

Momentum icon

Momentum

Momentum

Transform your browser into a beautifully designed tab that helps you feel calm, keep focus, and stay energized.

Installs

2.0M+

Rating

4.5

Google Scholar PDF Reader icon

Google Scholar PDF Reader

scholar-chrome-extensions

Supercharge your paper reading: follow references, skim outline, jump to figures, cite and save.

Installs

2.0M+

Rating

4.1

Keeper® Password Manager & Digital Vault icon

Keeper® Password Manager & Digital Vault

Keeper Security

Generate strong passwords, autofill and protect your confidential info with zero-knowledge encryption.

Installs

2.0M+

Rating

4.8

AI Grammar Checker & Paraphraser – LanguageTool icon

AI Grammar Checker & Paraphraser – LanguageTool

lt-extension-publisher

Instantly Enhance Your Texts with LanguageTool’s Grammar Checker and Paraphrasing Tool

Installs

2.0M+

Rating

4.7

Snow Web Application Metering icon

Snow Web Application Metering

snow_chrome_extensions

This extension tracks web application use for the purpose of license compliance and cost optimization. www.snowsoftware.com/browser

Installs

2.0M+

Rating

1.3

Sound Booster - increase volume up icon

Sound Booster - increase volume up

Sound-ultimate.com

Volume Booster helps boost sound video or music on any tab! Increase volume and bass booster, equalizer. Volume control.

Installs

2.0M+

Rating

4.5

Evernote Web Clipper icon

Evernote Web Clipper

Evernote

Use the Evernote extension to save things you see on the web into your Evernote account.

Installs

2.0M+

Rating

4.7